Melden Sie sich

Song Tranh 3 Hydropower Project

Viet Nam
Song Tranh 3 Hydropower Project

Standort
Viet Nam
Typ
Small hydropower
Registry
Standards
CDM Gold Standard 4 Global Goals

Ziele für nachhaltige Entwicklung

1. Keine Armut

Employees earn more than 50% higher salary than the local average

strengthening their financial resilience 

3. Gesundheit und Wohlergehen

Health insurance and annual health checks

for everyone working at the project

4. Hochwertige Bildung

Training sessions

on plant operation & maintenance along with technical training on monitoring processes

7. Bezahlbare und saubere Energie

230,000 MWh generated

each year on average by the project

8. Menschenwürdige Arbeit und Wirtschaftswachstum

38 people employed 

boosting the local economy

13. Maßnahmen zum Klimaschutz

120,000 tonnes of CO2e reduced

on average per year

Die Lösung

The project’s purpose is to generate hydroelectricity from Tranh River, a clean and renewable source, to supply the national grid via a Power Purchase Agreement (PPA) signed with the Electricity Corporation of Viet Nam (EVN). The project's installed capacity and estimated annual gross power generation is 62 MW and 230.7 GWh , respectively. The net electricity generated (with an estimated annual volume of 228.393 GWh ) will be supplied to the national grid via a new constructed transmission line from the plant to transformer station.

project_image_300654.jpg
project_image_300654.jpg

Die Auswirkungen

Modern, efficient turbines will generate electricity without damaging Vietnam's natural environment. As part of the plant’s construction, the roads in the mountainous area will be rebuilt, improving local infrastructure for the communities who live in the surrounding, remote villages. The project will hopefully spark more economic prospects in the area, bringing employment opportunities.

Project ID: 300654
Available Languages