Contáctenos

Indonesia

Ubicación
Indonesia
Tipo de proyecto
Geothermal
Estándares
CDM Gold Standard 4 Global Goals Gold Standard + CDM

Objetivos de Desarrollo Sostenible

7. Energía asequible y no contaminante

736,000 MWh

generated on average annually by the geothermal plant, providing a clean, sustainable electricity alternative to fossil fuels

8. Trabajo decente y crecimiento económic

70-80 jobs

provided in plant operation and geothermal field operation, as well as temporary jobs during construction

13. Acción por el clima

481,000 tonnes of CO2e avoided

on average annually

La solución

Located in Southern Sumatra, east of Bandar Lampung, the Ulubelu power plant taps into the nearby Ulubelu geothermal field to generate clean electricity for the Sumatra Interconnected Grid. Heat from the underground geothermal reservoir produces steam which spins a turbine and drives a generator to produce clean and renewable electricity. 

project_image_300910-4.jpg
project_image_300910-5.jpg
project_image_300910-6.jpg
project_image_300910-7.jpg
project_image_300910-4.jpg
project_image_300910-5.jpg
project_image_300910-6.jpg
project_image_300910-7.jpg

El impacto

As well as producing clean electricity and reducing greenhouse gas emissions, the Ulubelu geothermal power plant contributes to Indonesia's sustainable development. By investing in the region, the project is creating employment opportunities, which boosts the local economy. As an inexhaustible source of energy, the geothermal power plant also diversifies Indonesia's sources of electricity generation, improving energy security and driving the country towards a low-carbon energy future.

Project ID: 300910
Available Languages