736,000 MWh

generated on average annually by the geothermal plant, providing a clean, sustainable electricity alternative to fossil fuels

8. Travail décent et croissance économique

70-80 jobs

provided in plant operation and geothermal field operation, as well as temporary jobs during construction

13. Mesures relatives à la lutte contre les changements climatiques

481,000 tonnes of CO2e avoided

on average annually

Le projet

Located in Southern Sumatra, east of Bandar Lampung, the Ulubelu power plant taps into the nearby Ulubelu geothermal field to generate clean electricity for the Sumatra Interconnected Grid. Heat from the underground geothermal reservoir produces steam which spins a turbine and drives a generator to produce clean and renewable electricity. 

project_image_300910-4.jpg
project_image_300910-5.jpg
project_image_300910-6.jpg
project_image_300910-7.jpg
project_image_300910-4.jpg
project_image_300910-5.jpg
project_image_300910-6.jpg
project_image_300910-7.jpg

Les résultats

As well as producing clean electricity and reducing greenhouse gas emissions, the Ulubelu geothermal power plant contributes to Indonesia's sustainable development. By investing in the region, the project is creating employment opportunities, which boosts the local economy. As an inexhaustible source of energy, the geothermal power plant also diversifies Indonesia's sources of electricity generation, improving energy security and driving the country towards a low-carbon energy future.